Just briefly, then I have to hit the sack - I'm on the east coast. I developed a set of programs to allow them to map out the design of a steel building, and my programs would calculate all the pieces they need to load on the truck to build it. Mitchell was very progressive in this area - this type of computerization enabled them to have the building up in record time. A Civil Engineer worked with me and used the computer to design the main support beams. Between the two of us the entire process was automated.